Project Information
Early Production Facility and the associated Central Tank Battery (CTB) Facility
Description
Client
A US based privately held Engineering, Procurement, Construction & Project Management company specializing in construction of heavy industrial facilities and pipelines. The company has extensive experience with oil terminals.
To get detailed information
Engineering Requirement
3D modeling and piping engineering of an Early Production Facility and the associated Central Tank Battery (CTB) Facility. Following equipment had to be modeled as a part of the project:
- 22 Storage Tanks – Test oil, Water and Oil
- Three Phase Separators (1 Vertical + 1 Horizontal)
- 1 vertical Two Phase Separator
- 1 Heater Treater
- 3 Fuel Gas Scrubbers
- 2 Knock Out Drums
- 1 Flare Stack
Delivered
- Final 3D Model
- Key Plan Layout
- Site Layout
- General Arrangement Drawings
- Isometrics Views
- Bill of Material (BOM)
Want to know more about this project?
Our Recent Projects
Our Recent blogs
Modular Process Skid Packages are today emerging as the
most sought-after solution for today's fast-paced industrial landscape because
of their efficiency, flexibility, and agility. These pre-engineered,
self-contained units offer a range of benefits, from cost savings to accelerated
project timelines.
AVEVA World Conference 2023 is a crucial event for
AVEVA software enthusiasts. Like in the past, even in 2023, we'll witness
industry experts, user practitioners, system experts, partners, software
developers, and customers converging at the San Francisco Moscone Convention
Center.
Modern-day engineers and designers continually strive
to push the boundaries of innovation, seeking efficient and sustainable
solutions. In this pursuit of engineering excellence, modeling software plays a
pivotal role.